# v460 — Controlled Hard-Gate Expansion Activation Approval Switch Current baseline before build: v459. ## Decision Reviewed v459 controlled hard-gate expansion dry-run activation boundary and proceeded with v460 controlled hard-gate expansion activation approval switch before changing payment collection, broker distribution limits, owned portal rules, or internal load-board access. ## What changed - Added Super Admin API `/api/admin/hard-billing-gates/expansion-activation-approval`. - Added `HardBillingGateExpansionActivationApprovalService`. - Added `AdminHardBillingGateExpansionActivationApprovalPanel`. - Added a new Super Admin panel inside `/admin/subscriptions` after the v459 dry-run activation boundary panel. - Added activation approval checks for approval switch state, v459 dry-run evidence, approval scope size, approval scope quality, controlled runtime baseline, runtime mutation lock, downstream guardrails, and approval evidence recording. - Added activation approval boundary sections for v459 dry-run source evidence, approval scope, approval switch intent, runtime mutation lock, controlled runtime baseline, rollback/support boundary, and exports/records. - Added activation approval row statuses for Switch ready, Already controlled, Needs v459 dry run, Rollback blocked, Guardrail blocked, Out of approval, and Locked. - Added CSV exports for activation approval rows, approval checklist, and activation approval evidence history. - Added audit events `HARD_BILLING_GATE_EXPANSION_ACTIVATION_APPROVAL_REVIEWED` and `HARD_BILLING_GATE_EXPANSION_ACTIVATION_APPROVAL_SWITCH_RECORDED`. - Extended the billing activation master checklist with v460 activation approval switch evidence and mutation-lock status. - Added `.env.example` flags for activation approval review, recording, export requirement, dry-run-record requirement, mutation lock, label, scope slugs, and max approval workspace count. - Removed a duplicate summary key from the v459 dry-run service while preserving behavior. - Updated changelog and active handoff documentation. ## Guardrails preserved - No payment collection was enabled. - No billing status mutation was added. - Broad hard billing gates were not expanded. - Controlled hard-gate runtime allowlists were not changed. - Broker distribution limits were not changed. - Owned portal rules were not changed. - Internal load-board access was not changed. - Prisma schema was not changed. ## Validation notes - `npm run dispatchspot:preflight` passed. - Targeted TypeScript transpile parser checks passed for changed files. - `npm run build` could not run in the sandbox because the uploaded source package does not include `node_modules`, and `next` is not installed here.